DOES YOUR POOL NEED (RE)SURFACING.

SCROLL DOWN AND FIND OUT HOW EASY IT IS WITH THE NEW RAMUC AQUATIC PAINT RANGE.

PHASE ONE

PREPEARE AND CLEAN

STEP ONE

INSURE THERE IS NO STRUCTUAL DAMAGE

MAKE SURE THERE ARE NO MAJOR CRACKS OR HOLES IN YOUR POOL AND CONSULT A PROFESSIONAL TO REPAIR IF THERE ARE ANY DEFECTS.

STEP TWO

PRESSURE WASH TO REMOVE DUST AND SAND

A PRESSURE WASHER ABOVE 3200 PSI IS RECOMMENDED

SWEEP OUT AND REMOVE ANY DEBRIS

REMOVE ANY REMAINING WATER, SAND, LEAVES, OLD PAINT ETC.

STEP THREE

MIX AND APPLY RAMUC CLEAN AND PREP SOLUTION

APPLY CLEAN AND PREP SOLUTION USING A GRADEN SPRAYER AND STIFF BROOM. ONCE COMPLETED, RINSE OUT WITH A GARDEN HOSE

Availability: in stock Many in stock Contact For Stock Availability You can purchase this product but it's out of stock

RAMUC CLEAN AND PREP 5L

R 1,500.00
RAMUC CLEAN AND PREP SOLUTION COVERS 45- 95 SQUARE METERS PER 5L

PHASE TWO

PAINTING
INSTRUCTIONS FOR RAMUC HI BUILD EPOXY.
MAKE SURE THE POOL SURFACE IS COMPLETELY DRY

TO DO THIS, TAPE A CLEAR PLASTIC IN MULTIPLE LOCATIONS AND WAIT A FEW HOURS. REMOVE THE PLASTIC AND INSPECT FOR CONDENSATION. IF PRESENT REPEAT UNTIL DRY

PROTECT ANY SURFACE WHERE PAINT IS UNWANTED

ONCE COMPLETELY DRY, COVER ANY VENTS, TILES AND ANY AREA WHERE PAINT IS NOT NEEDED

MIX PART A&B HI BUILD EPOXY

FIRST MIX PART A AND PART B SEPRATELY AND THEN TOGETHER IN A 1:1 RATIO.MIXING SHOULD BE DONE MECHANICALLY AND NOT BY HAND. THE PAINT SHOULD BE LEFT FOR ABOUT 20 MINS AFTER MIXING.

START PAINTING HARDER TO REACH AREAS FIRST

START PAINTING WITH A PAINTBRUSH IN AREAS HARDER TO REACH SUCH AS ROUND THE VENTS OR NEAR THE CORNERS.

PAINT THE REST OF THE POOL

USING A ROLLER, PAINT THE WALLS FIRST THEN THE FLOOR STARTING FROM THE DEEP.A SECOND COTE MAY BE NECESSARY DEPENDING ON THE FIRST

6.2M²/L*
*SPREAD RATE COULD DIFFER ACCORDING TO LOCATION
Availability: in stock Many in stock Contact For Stock Availability You can purchase this product but it's out of stock

RAMUC HI BUILD EPOXY PART A&B AQUATIC PAINT 10L (5L+5L)

R 4,950.00
AVAILABLE IN THREE DIFFERENT COLOURS.
DRYING

ALLOW 16-72 HOURS TO DRY FOR A SECOND COAT (IF NECESSARY). RAMUC RECOMMENDS 5 NON-RAINING DAYS BEFORE FILLING THE POOL WITH WATER.

BACK TO TOP